Projects
Projects at Seven Ocean
VIBRATION ANALYSIS ON M/E @ ANCHORAGE
FABRICATION OF ANCHOR WINCH DRUM
FABRICATION OF EXPANSION BELLOW
FABRICATION OF REDUCER & PRESSURE TESTING @ 300 BAR
INSULATION JOBS CARRIED OUT @ ANCHORAGE
COOLER RE-TUBING DONE & PRESSURE TESTED SUCCESSFULLY
PHE SERVICED( 80 PLATES), PRESSURE TESTED & BOXED BACK @ ANCHORAGE
REPAIR OF FOREPEAK TANK
Ship Side Steel Plate Renewal job @ Singapore OPL.
GRAB- MAJOR STEEL WORK @ ANCHORAGE
TANK CLEANING & MANPOWER SUPPLY
MAK PISTON CROWN- INSPECTION & RECONDITIONING @ WORKSHOP
DECK CRANE LOAD TEST
MFG & SUPPLY OF PILOT/EMBARAKATION LADDER – MED APPROVED
OUR ELECTRIC MOTOR WORKSHOP